ARACON vector

An aluminium panel and prop deck for slabs, arranged so the panels come out early and the props stay in until the concrete has its strength.

What earlystripping buys

On a conventional deck the formwork cannot come out until the slab can carry itself, which means a full set of panels is tied up on every floor. Vector separates the two. The panels are released early and taken to the next floor while the props remain under the slab, carrying it until it is ready.

The practical effect is that a contractor buys fewer panels to run the same cycle, because the same panels are working on the floor above while the slab below is still curing.

The panels are aluminium, so a deck is assembled and stripped by hand rather than by crane.

A vector bay in service, panels on prop heads with an access stair running up through it

Specification

Panel material
Aluminium
Method
Early strip: panels released, props remain

Flash Deck is this system under the prior brand, and the page for it publishes no dimensions, masses or capacities. No ARACON datasheet exists yet either, so nothing here is a measured value. A further 8 values are held until the ARACON datasheet is signed. Ask for the specification as it stands today and it will be sent.